How to equip an office step by step: who does what, deadlines and three real cases

The seven steps to equip an office, who does what between architect, construction company and Dunati, when to start planning and three real cases in Chile.

By Leonardo Bianchi, CEO at Dunati

Sala de capacitación de Skill Center equipada por Dunati

To equip an office without surprises, the furniture is decided before work on the premises begins, not when the space is already finished. The process has seven steps, from survey to post-sale, and Dunati is in charge of planning and equipment: 3D distribution, furniture, installation and warranty. The work on the premises is coordinated by your architect or your construction company, and Dunati works with them so that the electrical points, the dates and the furniture fit. If you don't have one yet, Dunati works with allied architects and construction companies and can recommend them to you.

What are the steps to equip an office?

  1. 1. Lifting

    What's happening
    Plan or measurements, number of positions, rooms and how the team works
    who does it
    You and Dunati; your architect, if there is one
    When to start
    When choosing the location
  2. 2. Layout and 3D

    What's happening
    Distribution of positions, rooms, booths and reception, in 3D with real products
    who does it
    Dunati, on the architect's plan or one of your own
    When to start
    There is barely a plan
  3. 3. Showroom and samples

    What's happening
    Try chairs and desks, see laminates, wall hangings and booths
    who does it
    You, with a Dunati advisor
    When to start
    While adjusting the layout
  4. 4. Quote

    What's happening
    Items with quantities, materials, installation and deadline
    who does it
    Dunati
    When to start
    With 3D approved
  5. 5. Technical visit and manufacturing

    What's happening
    Rectification of measurements, colors and final details; then manufacturing and import
    who does it
    Dunati
    When to start
    With advance paid
  6. 6. Dispatch and installation

    What's happening
    Delivery with own equipment, assembled and installed, in Santiago and in regions
    who does it
    Dunati
    When to start
    When the place is ready
  7. 7. After-sales

    What's happening
    Warranty, spare parts, adjustments and extensions
    who does it
    Dunati
    When to start
    Since delivery

The quickest step is step 3. A chair is chosen by sitting in it, not by the card: take two or three people from the team, of different heights, and try it with the seat and lumbar adjusted. If the decision is between two models, ask the advisor to lend you chairs to evaluate them in your office before purchasing; Dunati does it with companies and coordinates on a case-by-case basis.

Who does what: architect, construction company and Dunati?

  • The architectdefines the project: floor plan, partitions, rooms, lighting and image.
  • The construction companycarries out the work on the premises: partitions, electricity, network, climate, floors, ceilings and painting.
  • Dunatiplans and equips: furniture layout, 3D visualization, manufacturing, import, delivery, installation and after-sales.

In practice, coordinating means three things. Share the plan so that the electrical and network points are where the stations go (Dunati connects the electrification of the furniture to the points left by the construction company; it does not do electrical or data installations). Set the date when the space is clean for installation. And, in corporate buildings, agree with the administration on entry, elevator schedules and packaging removal, something that Dunati coordinates directly.

If you work with an architect, Dunati gives you what you need to specify: DWG and DXF blocks, 3D models in OBJ, 3DS and SketchUp, a plugin for pCon.planner, laminate and tapestry textures, technical sheets and physical samples at no cost.

What is manufactured in Chile, what is imported and how long does each thing take?

The countertops, melamine storage and custom furniture are manufactured in Chile; The metal structures are imported, the chairs are assembled in Chile with imported components and the sofas, armchairs and booths are of imported international design. From that mix comes the deadline of your project:

  1. Products in stock, Metropolitan Region

    Reference period
    Up to 3 business days, from the business day following payment
  2. Desks, tables and receptions in high-end laminates

    Reference period
    From 10 business days, counted from the payment or advance payment
  3. Project of about 20 positions with line laminates

    Reference period
    From 10 business days of manufacturing, closer to 1 day of installation
  4. Larger projects

    Reference period
    Between 15 and 35 business days depending on size, plus 2 to 12 days for installation
  5. Zenpod cabins with stock in Chile

    Reference period
    About 10 business days, delivered and installed
  6. Cabins in colors by import

    Reference period
    120 consecutive days
  7. Other products that are imported

    Reference period
    About 85 business days
  8. Shipping to regions

    Reference period
    Add 2 to 3 business days on chairs, 5 on small and medium projects, 7 on large projects and imports

They are references, not commitments: special colors and wood veneers lengthen manufacturing, and the firm deadline for each item is included in the quote. What is important to know from the beginning is which game is the longest, because it is the one that marks the moving date.

When should you start planning furniture?

Before closing the budget for the local work. Two reasons:

  1. The furniture defines where the electrical and network points go. If they are where the stations do not go, the floor must be reopened, and that costs a little before and a lot after.
  2. The import is the longest item in the project and cannot be shortened urgently.

Rule of thumb: the approved 3D and the paid advance should be ready when the construction company starts on the premises.

What makes the price vary and how is it paid?

The price is influenced by the number of seats, the chair model, whether the desks are fixed or elevating, standard or custom-made, how many rooms and cabins the project includes, the materials for covers and upholstery, electrification, installation and the deadline. Dunati quotes the set with the approved 3D.

In quoted projects, a 50% advance payment is paid and the balance before delivery; Smaller orders are paid in cash. Companies can request payment with a purchase order within 30 days, subject to Finance approval.

What does this look like in real projects?

Cresciente Medical, Las Condes.A small and fast project, closed on October 28, 2025 and delivered and installed on November 10, 8 business days later. He brought a Federica modular sofa with three side modules in light grey, medium blue and red, three Bongo poufs, 25 reupholstered Malva visitor chairs, a Grace chair and support tables, including the Pau and three 70 cm round tables. It worked because almost everything came from in-stock or short manufacturing lines.

Blue Express, Pudahuel.The 2021 project was done in three stages: operational area, meeting rooms and coffee tables, and chairs with soft seating. The company bought again in 2022 and in 2024: Federica modular sofa in medium blue and light gray, four Aramiz armchairs, 20 Cooper chairs, 11 Soho and Otto stools, four high tables, a 400 × 120 cm Arista meeting table, Versa desks in groups and four Steelbox drawer units. It is the typical case of a company that grows: maintaining the series allows each expansion to fit with what is installed.

Skill Center.An equipment project for a training room and a meeting room.

What does after-sales include?

  1. Sillas

    Warranty
    3 years
  2. Desks, storage, tables and receptions

    Warranty
    5 years
  3. Sofas, armchairs, armchairs, poufs and booths

    Warranty
    3 years

The legal guarantee runs separately. To use it, write to info@dunati.com with the order number and details of the case; Photos and purchase history are requested, Dunati technicians validate the failure and an executive confirms the procedure before moving the product.

After the warranty, the chairs are not thrown away: Dunati maintains spare parts for armrests, mechanisms, mesh backrests, star bases, wheels and pistons, so only the damaged part is changed. And when the team grows, the same series allows adding positions equal to those installed.

Where to start?

In the showroom at Av. Vitacura 6577, Vitacura, Santiago, which has parking and is open from Monday to Friday from 8:30 a.m. to 6:00 p.m. and on Saturdays from 10:00 a.m. to 2:00 p.m. The visit is coordinated by WhatsApp at +56 9 8583 5709 or from the contact page. In addition to furniture, you can see samples of materials and finishes; As not all the models are on display, it is advisable to ask beforehand if the one you are interested in is in the room.

Is Dunati in charge of the local work?

Dunati is dedicated to furniture and its distribution: layout, 3D, manufacturing, installation and after-sales. The work on the premises is coordinated by your architect or your construction company, and if you don't have one, Dunati recommends allies.

Do I need an architect to equip an office?

If the premises need partitions, installations or floors, yes. To equip an already finished space, Dunati draws the furniture distribution in 3D without the need for an architect.

How long does it take to equip an office with 20 people?

With line laminates, from 10 business days of manufacturing closer to one day of installation in the Metropolitan Region. Imported and special colors lengthen it; The firm term is in the quote.

Can it be equipped in stages?

Yes. It is common in companies that grow: the same series and the same colors are maintained so that the expansions can be integrated.

What warranty does the furniture have?

Chairs, 3 years. Desks, storage, tables and receptions, 5 years. Sofas, armchairs, armchairs, poufs and booths, 3 years.

Do you install in regions?

Yes. Between 2024 and 2026 Dunati delivered orders in 15 of the 16 regions of Chile. Shipping adds business days to the deadline and shipping is quoted on a case-by-case basis.

What should you bring to the first meeting?

The plan or a photo with measurements, the number of people, how many rooms are needed, the moving date and the data of the architect or construction company, if they are already defined.